March 19, 2016

Yesterday had no rain and we got several rain-free hours today, so I :

removed the next section of floorDSCF0750

inspected the frame, which was rusty but the welds look fine.

DSCF0754

Did the standard wire brushing, with sand blasting where the brush can’t get.

DSCF0756

DSCF0759

 

DSCF0761
and added two coats of Alumathane.  Here’s after the first.

DSCF0765

 

 

DSCF0766

After the same adjustment with the pipe clamp I got the floor in place and attached.  Forgot to take a picture. This completes the four flat floor sections.